rainwater harvesting PP module/ Modular underground stormwater detention tank/ plastic soakaway crates

Images

4 images

rainwater harvesting PP module/ Modular underground stormwater detention tank/ plastic soakaway crates

rainwater harvesting PP module/ Modular underground stormwater detention tank/ plastic soakaway crates

rainwater harvesting PP module/ Modular underground stormwater detention tank/ plastic soakaway crates

rainwater harvesting PP module/ Modular underground stormwater detention tank/ plastic soakaway crates

rainwater harvesting PP module/ Modular underground stormwater detention tank/ plastic soakaway crates

Published by

Description

Whats rainwater harvesting module?                                                                           The rainwater harvesting module is part of the rainwater recycling system, and several rainwater harvesting module units are combined to form an underground reservoir. According to the engineering needs, the anti-seepage geotextile or the permeable geotextile is wrapped around the pool to form different types of storage tanks, permeation pools and flood control ponds. The rainwater collecting module is used to assemble the pool, which is convenient to install, has large bearing capacity, does not breed mosquitoes and algae, and can be removed and moved to other areas for further use after being used in the temporary construction area.

Advantages of Eijing Rainwater harvesting module:
1. made of recycled, environment-friendly and energy-saving polyethylene, with strong bearing capacity, resistant to aging, high temperature and low temperature, service life over 40years.

  1. 95% high void ratio and up to 70ton/m² compressive strength.
  1. Easy installation, can be done just by hand,  less than 1 minute per cubic meter.
  2. Can be flexibly combined according to the shape of pool, no site restriction
  3. Can be installed under the green, roads, squares, parking; sports ground underground. Not occupy the ground space, and not affect the landscape effect.
  4. Easy to carry or transport:with split design, modules can be arbitrarily disassembled, a 40HQ can load 300 CBM.

Short lead time: 5000CBM can be delivered in 10days.