| | (i) Lead the entire commissioning team (PID, Consultant’s and Contractor’s designated personnel) in flushing, testing and disinfection of the entire system (BDS, SRTs and DNIs); (ii) Work closely with Commissioning Expert (International) and DSC-05 during commissioning of BDS, SRTs and DNIs; (iii) Interacting with Senior managers/ Engineers/ Consultants/ Contractors/ Technicians and other stakeholders, including the officials of KVWSMB, KUKL and KUKL branch offices and PID as required to gain an understanding of the system; (iv) To ensure that all necessary tests, specified in the contract documents for any relevant sections, for the Pipes, SRTs, Valves, other Fittings and Accessories and Appurtenances are conducted before the system is put to service; (v) Making field visits and recommend for replacement of any fittings, pipes, and appurtenances to PID/KUKL as required if any, based on their defects, incompatibility to design, flow obstructions/ interference and inappropriateness to system functioning; (vi) Ensure the proper flushing and disinfection requirements as per standard practices; (vii) Ensure that the system and it’s accessories in accordance to parameters of design model as far as practical is calibrated by the contractors and checked and recommended by the consultant; (viii) Ensure that the network, SRTs and accessories are tested, disinfected and commissioned under a systematic approach following a methodical planning and it’s execution; (ix) Work with Commissioning Expert (International) in establishing a system inside KUKL for UFW control, including leak detection and management, and prompt and efficient repair/replacement of faulty pipes, joins, accessories when required; (x) Involve in conducting job training of technical staff for O&M during the commissioning of the schemes and need identification including broad content design for further training requirements and providing guidance to the development of Checklists and SOPs for future repair and maintenance; (xi) Prepare/update template for step-wise NRW Commissioning Plan to be prepared by the contractor for each of the DMAs of the DNI works; (xii) In overall, to ensure that testing and commissioning of the system follows a planned approach and that the KUKL receives a system that is fairly stabilized and efficient for operation in the physical sense, after calibrations according to acceptable standards; (xiii) Assist PID staff to supervise the construction of transmission pipelines, distribution networks, storage reservoirs, water treatment plants and other related structures, as deemed necessary; (xiv) Coordinate with local authorities and other relevant agencies and institutions as required for the project implementation; (xv) Configure the distribution zones and district metering areas (DMAs) in coordination with KUKL and its relevant Branch Offices; (xvi) Perform any other relevant tasks within the scope of services as requested by Project Director, PID  |