I agree with Gary. From the given figures I do not think a quick fix would be possible, although some short term mitigation measures may be possible if more information is made available. One would need to consider more detailed design, actual loading and operational information to determine the way forward. Regards
Published by Andre Visser, Process Engineer at Water Engineering Consult
I agree with Gary. From the given figures I do not think a quick fix would be possible, although some short term mitigation measures may be possible if more information is made available. One would need to consider more detailed design, actual loading and operational information to determine the way forward. Regards