We are designing a water treatment plant of 216 MLD capacity wherein the client is insisting on flat bottom sludge blanket clarifiers with mechanical scrappers

Published by

We are designing a water treatment plant of 216 MLD capacity wherein the client is insisting on flat bottom sludge blanket clarifiers with mechanical scrappers

9 Comments

In this case is to better to use 60 m3/m2/day to calculate the section of the filters if money s not problem.

Published by

Permalink

Mechanical structures is ever one more problem so, manutention is necessary and expensive

Published by

Permalink

Using a upstream clarifier you can use, too, a sludge treatament in separate. 

Published by

Permalink

The turbidity is small or medium so, you can use an upstream clarifier. The Filter washing water is the problem due to the high volume. But if this is not a problem I would prefer this.

Published by

Permalink

There is a impediment to use flat bottom? Rock or other thing

Published by

Permalink

I think that you have to use a sludge treatment in separate

Published by

Permalink

If I understood you will need a conventional treatment.