Though I have not dealt with ...
Published by Rajesh Bhatt, Entrepreneur
Though I have not dealt with the impact assessment studies for the similar topic, I was dealing with the temporary and long term restoration of water resources project (Dams/ Canals/Pipelines etc.) affected by one of the worst earthquakes (in 2001 in Kutchh Gujarat-India). I would suggest to delineate the issues related to the ground water and surface water, which can be dovetailed subsequently. Apart from the economic aspects, there is a huge social impact which needs to be evaluated. Impact on irrigation, drinking /domestic water supply, industrial water , hydro power generation may also be evaluated.
Rajesh Bhatt
Poseidon Hydro Infratech
Ahmedabad (Gujarat -India)
1 Comment
Thank you for your response.
Published by Anju Air, Natural Resource Management Professional