I ever considered 3 m/s as ...

Published by

I ever considered 3 m/s as pressure system; you can refer to pipe engineering or calculate directly from pipe specs sheet about permitted ft/s for the whole area

for non pressure sewage system is considered since 0.5 m/s with 3% to 5% length slop; the effective sewage area segment is the standard minimum chord; hope it helps