It should be 30% of tank ...
Published by satyam arya, Design Engineer at Geo Miller & Co pvt. Ltd
It should be 30% of tank volume...thumb rule
1 Comment
Your application is not fully outlined.
Do you require COD / BOD Removal only or do you require nitrification-denitrification ?
Loading rates vary significantly with application
Also what is the wastewater source?
As a general guide refer to WEF Manual of Practice No.35 - 2010
Published by seamus crickley, Director at WEW Engineering Ltd., Consulting Engineers