Dear Mr. Mohammed



For last reply I sharing my idea to you to us MBR. But lastweek I went paper which which be faced with the Problem of Effluent same like you. Ok firstly You need long HRT for Anaerobic at least 5- 15 days in Thailand we use Modified Cover lagoon with De-sludge pipe with Acid pond to increasing VFA higher.For UASB here is not work because it is to short HRT, only 12 hrs the efficiency is only 65%, I solved this task by design new MCL sizing 45,000m3 now under construction. And after treated by UASB you need settling pond then COD of the Effluent will be decrease quit much or you can dosing PAC, Alum with less of polymer to settle down all SS. And these will lead to increasing  aearation to treat wastewater to reach std. Finally if you install MBR everything will be reach WW std and you can reuse water to the process line.



Best Regards



AGGASIT DAD



aggasit2012@gmail.com



WhatsApp +66917027747 BKK Thailand

1 Comment

Thanks dear Mr. Aggasit.

 

But we have limited area, about 50 m² only available. 

So can we establish a system in this area ?

Published by

Permalink

1 Comment