Q1. How long has the load been lower or at what date did the load decrease, A1. The load lower initiate date is 8/22, and the NH3-N reduction rate decreased is 8/28. Q2. What is the reactor water temperature, A2. The temperature is about 35℃. Q3. what sludge age are you operating the reactor A3.The sludge we drain is 5 mins every 30 mins, the sludge age we do not calculae yet. Q4. what procedure do you follow to control the sludge age/MLSS concentration? A4.To maintain the MLSS is about 3,000~3,500 ppm.
Published by Lin JYH-YAN, advanced engineer at FORMOSA PETROCHEMICAL CORPORATION
Q1. How long has the load been lower or at what date did the load decrease,
A1. The load lower initiate date is 8/22, and the NH3-N reduction rate decreased is 8/28.
Q2. What is the reactor water temperature,
A2. The temperature is about 35℃.
Q3. what sludge age are you operating the reactor
A3.The sludge we drain is 5 mins every 30 mins, the sludge age we do not calculae yet.
Q4. what procedure do you follow to control the sludge age/MLSS concentration?
A4.To maintain the MLSS is about 3,000~3,500 ppm.