We are treating 500 gpm, The ...
Published by Barry Zvibleman, CEO at Barry Zvibleman
1 Comment
Hi Barry, we also work with AOP with 16 years of experience re-purifying wastewater as drinking water or treating industrial to meet discharge EPA standards, such as congenital (hydrocarbon) wastewater.
Our standard size size 1 lps (15.85 gpm) requires around 22 yd2, of course O&G WW requires larger area; complementary retrofit must be evaluated.
Our standard certified WWP test is US$40,000 including five emergent pollutant compounds.
I know very well airplain deicing, so if you would like to share the ww content even if were very low to figure out, I'll appreciate.
For your confidence, any WWP challenge we have had, have been successfully solved.
Since 2018 I re-started up as microenterprise but still connected with my ex-partner if were necessary.
I keep pending of your information or comments
Regards
Arturo Constante
M. +52 55 3155-9654
Published by Arturo Constante, Wastewater Purification - Zero Emissions