i would like to present the proble o of our Water Distribution Network in Makassar.  There are many problems about the Capacity to delivered in to Indutrial zone. the Diameter of pipe is 300 mm but the capacities of water  only  flow 150 L/sec. for 16 km. so that is the problem of our water network

Published by

i would like to present the proble o of our Water Distribution Network in Makassar.  There are many problems about the Capacity to delivered in to Indutrial zone. the Diameter of pipe is 300 mm but the capacities of water  only  flow 150 L/sec. for 16 km. so that is the problem of our water network

 

2 Comments

Slmt pagi pak Beny, I remember during the NRW project that I managed in 2007/2009, most of water losses and efficiency issues in Makassar were non technical. The other challenge was demand management more than production capacity. Did you implement the recommended Zoning strategy? It will be a pleasure to help you if I can. Didier.. You may contact me at didier.perez@pipa.co.id 

Published by

Permalink

hi pak Beny, nice to meet you, before saying you have problem, you better measure the inlet flow to your pipe ( how much is your inlet flow), then after that, you can see wheter your flow reduce or not, who nows there are leaks along the pipe

Published by

Permalink