Dear Murthi. 1..Without ...
Published by Ajit Seshadri Seshadri, Er.
Dear Murthi.
1..Without affecting the present road usage, the desilting job is to be done- to clear 20m x 3m 60 cbm will become 100 cbm of sludge Etc..
2. Sloping road lanes are to be done to bring in mechanical JCBs and removal of sludge matter. etc.. on 4 places.
3. Once the job is completed the road lanes to be lined with stones and firmed for doing cleanup easily in future too ..
4. In the upstream areas. at locations where streams joinbwith main river, large du g outs are planned and done.
This would assist all sludges to be dredged / desilted regularly.
All the sludges removed need to be co composted to produce manure Etc..