Dear Daxesh,

We suggest you to Neutralize your acidic effluent and maintain pH between 7-8. Add suitable coagulant and flocculent for primary treatment after conducting jar test, which will remove your COD up to 15-25%. You have to treat Primary treated effluent with Anaerobic biological treatment in digester. the digestion time may range from 3 days to 10 days. It is depend on your laboratory trial. Anaerobic treatment removes COD, BOD and ammonical nitrogen successfully. You have to install extended aeration after anaerobic digester with retention time of 3 days. Aeration effluent will charged in Secondary clarifier. Secondary clarifier outlet will pass through MGF and ACF for further Polishing treatment.

Kindly send us effluent quantity (Pick, average and lean flow) on our email climateventure4careu@gmail.com . Also send us your factory address, if it is in india. We will visit your factory and conduct all above trial at your laboratory.

Thanks

Vimalesh Patel

9376034476

1 Comment

Dear Vimalesh ,

when i reach to effluent  pH 6-7 at that time my TDS level is around 28000 to 29000 mg/L . so at that concentration my Anaerobic biological treatment work successfully?

 

Published by

Permalink