I would suggest that you ...

Published by

I would suggest that you rework the entire process requirements and then work out the capacity requirements of the electro-mechanicals system afresh. It is wiser to provide electrical system with Earthing , MCBs and also check if there is any additional protection from provision of a transformer to stabilise Voltage if there is too high fluctuation in supply voltage.. May also study if Solar penal based generation with battery storage could curb any drop in Voltage.

1 Comment

Thanks for your comments. Regarding the solar I have found that "complicated" electronics tend to become problematic in more remote areas without expertise and maintenance, so I probably wouldn't go for that.

When you say process requirements, I assume that you mean operating/start-up powers of the various pumps. This is known, so the electrical supply shouldn't be a problem, the main issue is protection, which remains a bit black magic to me ;-) Thanks for your input